Ahmedabad Metro Phase 3: Dholera Airport Connectivity Gets a Major Push

Ahmedabad Metro Phase 3: Dholera Airport Connectivity Gets a Major Push

latest Dholera Update 2026 covering Dholera ,Dholera Metro,Ahmedabad Dholera Metro rail,Dholera infrastructure progress, and real estate growth in Dholera.

📅 August 8, 2026 | ⏱️ 3 Min Read | 📂 Ahmedabad Metro Phase 3: major connectivity booster for Dholera International Airport

 

The proposed Ahmedabad Metro Phase 3 has received clearance from the Public Investment Board (PIB), marking a major step for Gujarat’s urban transport network. The 60-km expansion by Gujarat Metro Rail Corporation (GMRC) includes 41 elevated stations and new corridors across South West Ahmedabad. The proposal now awaits final approval from the Union Cabinet

dholera metro project
thaltej gam to dholera international airport connectivity

Dholera Airport Connectivity Gets a Major Push

The proposed Thaltej Gam–Badrabad corridor could become an important gateway toward Dholera SIR and the upcoming Dholera International Airport. The route will pass through key areas including Godhavi, Bopal and Shantipura before reaching Badrabad near the Ahmedabad-Dholera Expressway. This could strengthen the long-term transport link between Ahmedabad and Dholera

Faster Connectivity and Better Access Across Ahmedabad

The expansion is expected to improve connectivity between Ahmedabad’s growing residential, commercial and institutional areas while reducing pressure on busy central routes. The proposed Vadaj circular loop would allow commuters to travel between several western, eastern and southern areas without passing through the city centre. Better connectivity could also support Dholera’s future industrial and economic growth.

Ahmedabad dholera metro connectivity route

"Dholera isn't just building factories—
it's building India's technology future."

KEY HIGHLIGHTS

Ahmedabad Metro Phase III gets PIB clearance — The proposed 60-km expansion now awaits final approval from the Union Cabinet.

Dholera Airport connectivity planned — The Thaltej Gam–Badrabad corridor will create a future transit gateway toward Dholera SIR and the upcoming Dholera International Airport.

Sports hub connectivity — The metro will connect Godhavi and SWASA (South West Ahmedabad Sports Arena), supporting future mega sporting events.

Vadaj Circular Metro Loop — A new ring-style route will connect major areas including Naranpura, Shivranjani, APMC, Isanpur, Amraiwadi and Dudheshwar, helping bypass central Ahmedabad.

41 elevated stations planned — Preparatory work including design consultancy, soil testing and utility-diversion planning has already begun to accelerate construction.

Intrested->share with friends

Thinking of Investing in Dholera Smart City?

TABLE OF CONTENT

What is Ahmedabad Metro Phase 3?

Ahmedabad Metro Phase 3 is a proposed 60-km metro expansion featuring 41 elevated stations, including the Thaltej Gam–Badrabad corridor and the Vadaj circular metro loop.

Will Ahmedabad Metro Phase 3 connect to Dholera Airport?

The proposed Thaltej Gam–Badrabad corridor is planned as a future gateway toward Dholera SIR and the upcoming Dholera International Airport, strengthening Ahmedabad–Dholera connectivity.

How will Ahmedabad Metro Phase 3 benefit Dholera?

Improved metro connectivity could make travel between Ahmedabad and the Dholera region easier, supporting industrial development, investment, employment and long-term economic growth

wpChatIcon
wpChatIcon
Scroll to Top